Inundation Studies in Case of Failure of King Talal Dam
In this paper a brief description of the studies is presented and the computed results are summarized. During running the program, several difficulties were encountered. These problems...

Earth Spillway Design Using SITES Software
The USDA Natural Resources Conservation Service has, recently released new software for the design and analysis of water resource structure sites. This software, SITES, is based on the...

Draining Himalayan Glacial Lakes Before They Burst
Glacial lakes are a common feature of the Himalaya in general and the Khumbu Himal region of eastern Nepal in particular. Some of these glacial lakes are naturally unstable because of...

Impacts due to Density Current Deposition in Reservoirs
Different flow pafterns of density currents in reservoirs are discussed. In delta region, lateral density currents from non-stratified flow in the main channel occurs resulting in floodplain...

Impacts of Reservoir Sedimentation on Decommissioning of Dams
A large number of dams in the United States of America and elsewhere are reaching the limits of their design lives. Owners, agencies and environmentalists are either considering or demanding...

Santa Ana River Mainstem Project
The Santa Ana River Mainstem Project consists of seven major features including the construction of 550 ft. high earth and rockf ill dam; raising the embankment by 28 feet of Prado Dam,...

Problem and Technical Solutions: The Seven Oaks Dam, Physical Elements of the Seven Oaks Dam Feature
Seven Oaks Dam is located in the upper Santa Ana Canyon approximately 1 mile from the canyon mouth. The site is 8 miles northeast of the city of Redlands in San Bernardino County on the...

Cooperative Approaches in Achieving Additional Water Conservation at Prado Dam
The Orange County Water District (OCWD) has successfully negotiated multi party agreements that provide for the use of Prado Basin for water conservation while ensuring protection of the...

The Timberlake Dam Failure: A Hydrometeorological Assessment
Extremely heavy rainfall over the Timberlake basin in southwest Virginia on 23 June 1995 caused an earthen dam to fail and resulted in fatalities. The meteorological conditions are examined...

Improving the Speed of Double Lockages
The size of tug and barge combinations on the Upper Mississippi River and Illinois Waterway frequently exceed the dimensions of the lock chambers they must pass through. The locks on these...

Recreational Impoundments Retrofit of Existing and Design of New Facilities
Water has been a critical component of most human endeavors, and its value as a recreational amenity is well-known. An increasing number of recreational impoundments are being considered...

Navigation Lock Improvements
All commercial barge traffic on the Upper Mississippi River and Illinois Waterway must pass through a system of locks designed and built in the 1930s and 40s. Many of the locks on these...

McAlpine Intake Model Study for Innovative Lock Design
The McAlpine Locks and Dam Project is located on the Ohio River near Louisville Kentucky. Construction of an additional 33.53-m-wide (110 ft) by 365.76-m-long (1200 ft) navigation lock...

Filling and Emptying System Model Study for the Innovative Lock Design
Funding constraints have generated innovative ideas regarding the hydraulic system of proposed navigation locks. Two fundamental questions addressed in the innovative lock design study...

Upper Mississippi River System Environmental Management Program (EMP)
Introduction The Upper Mississippi River Navigation System (UMRNS) is one of the largest Public Works projects existing within the continental United States of America. The system, which...

Developing a Rating Table for the Central Diversion Dam Radial Gates
The Central Nebraska Public Power and Irrigation District uses radial gates for flow control throughout its system. The rating tables for five radial gates on a diversion dam are in error,...

Hydraulic Model Study of the Prado Dam Spillway
The existing Prado Dam, located in the City of Corona, CA, is deficient in providing adequate flood protection to the Santa Ana River floodplain downstream of the dam. To provide adequate...

Dam Foundation Erosion Study: Pit 4 Scale Model Simulation
This paper describes the results of a sub task of the Dam Foundation Erosion Study, a cooperative research study by Reclamation, PG&E, Colorado State University, and Western Area...

The Costs and Benefits of Dam Removal on the Elwha River
The Elwha River is located on the Olympic Peninsula in the State of Washington. In the early 1900s two hydroelectric dams were built on the Elwha River. Construction of Glines Canyon and...

Creeping Suspicion
High-capacity, epoxy-coated anchors were installed at Upper Occoquan Dam to increase the stability of the 70-foot-high concrete gravity dam and powerhouse under revised Probable Maximum...

 

 

 

 

Return to search